Unrestricted Report

ITEM NO:

Application No.

21/00707/OUT

Ward:

Wildridings And Central

Date Registered:

14 July 2021

Target Decision Date:

13 October 2021

Site Address:

Former Bus Station Site Market Street Bracknell Berkshire 

Proposal:

Hybrid planning application (part detailed / part outline) for the phased redevelopment of the Site to provide 169 units of residential accommodation (Use Class C3) and up to 850 sqm commercial floorspace (Use Class E(a),(b),(c),(d),(g),(g(i)) and F1(a) & (b)) delivered across three blocks of accommodation [detailed element] and the erection of a single block providing up to 2699 sqm of commercial floorspace (Use Class E (b), (c), (e), (f) and (g) and F2(b)) [outline element, matters reserved - layout, scale and appearance] and all other associated works including landscaping, public realm, car parking and cycle parking.

 

NOTE: Hybrid Application - Full planning permission is sought for the Blocks A/B/C, landscaping, access and car parking.

Applicant:

Bracknell Forest Cambium Partnership

Agent:

Miss Nadine James

Case Officer:

Margaret McEvit, 01344 352000

Development.control@bracknell-forest.gov.uk

 

Site Location Plan (for identification purposes only, not to scale)

 

 

 



OFFICER REPORT

 

1.    SUMMARY

 

1.1 The proposed development relates to a site within the settlement boundary and is

therefore acceptable in principle. The site is a proposed allocation site in the Emerging Local Plan for 141 dwellings net and 4,700sqm commercial floorspace.

 

1.2 The development of the site would result in the loss of trees on the site but the affected trees are not protected by TPOs and replacement trees are proposed on the site.

 

1.3 The proposal would not adversely affect the residential amenities of neighbouring

occupiers and acceptable living conditions would be provided for future occupiers of the flats. The proposed commercial uses are appropriate within a town centre location and adequate servicing has been provided to serve these uses. The proposal would also not adversely impact upon the character and appearance of the surrounding area.

 

1.4 No adverse highway safety implications would result.  Parking to meet the town centre parking standard has been provided using a combination of on-site and off-site parking within town centre car parks. Sufficient on-site parking provision, cycle and bin storage has been provided.

 

1.5 A legal agreement is required to secure contributions for SPA mitigation, biodiversity measures, a Travel Plan, highway requirements, active and passive OSPV and community facilities to secure 25% affordable housing,

 

 

RECOMMENDATION

The Assistant Director: Planning be recommended to approve the application subject to the completion of a S106 Agreement and the conditions set out in Section 11 of this report.

 

 

2. REASON FOR REPORTING APPLICATION TO THE ADVISORY PLANNING COMMITTEE

 

2.1 The application has been reported to the Advisory Planning Committee because it relates to a scheme which the Executive Director: Place Planning and Regeneration is responsible for promoting.

 

3.    PLANNING STATUS AND SITE DESCRIPTION

 

PLANNING STATUS

Within settlement boundary.

 

3.1     The site measures approximately 0.53ha and is located on the west side of Market St. at the junction of Market St and Skimped Hill.  The site has been vacant for several years and is currently screened by hoardings. The western boundary of the site is shared with the Peel Centre. North of the site, across Skimped Hill is Winchester House, with the current construction site of the former Amber House immediately to the south.  

 

4.       RELEVANT SITE HISTORY

 

4.1     No recent planning history.

 

5. THE PROPOSAL

 

5.1 This is a hybrid planning application proposing full planning permission for the erection of three Blocks (A, B and C) to provide 169 residential units to include 29 affordable rented homes and 13 shared ownership homes and 848 sq.m of commercial floorspace

 

5.2 Outline planning permission for Block D is also sought with access and landscaping to be considered for up to 2,699 sqm of commercial floorspace (Block D) (Use Class E (b), (c), (e), (f) and (g) and F2(b).

 

5.3 Buildings will vary in height from 6 storeys to a maximum of 17 storeys in Block A. 

 

5.4 The application also includes the provision of amenity space, public realm improvements and new public pedestrian links throughout the site.

 

5.5 A total of 89 car parking spaces will be provided for the residential element on site, with the remaining 117 spaces for the residential and commercial uses provided off-site.  298 cycle parking spaces will also be provided to serve the full application element with 56 spaces to serve the outline element of the scheme, comprising a total of up to 354 spaces.

 

5.6 Access to the site will be from two new entrance points on Market Street delivering a new loop route for access within the Site.

 

 

 

6. REPRESENTATIONS RECEIVED

 

 

Bracknell Town Council

 

 6.1 No objection to the application.

 

Representations 

 

6.2 The Bracknell Forest Society object to the application on the following grounds:

 

- The scale of the development is excessive, and the impact of tall buildings must be assessed in light of the existing tall buildings in the town centre and others proposed in current applications on nearby sites.

 

- Off site parking in the High Street carpark should be assessed against projections for

future usage, not those for shortly after the opening of phase 1 of the town centre

redevelopment. This should include parking projections if free car parking is ended at the Peel Centre.

 

- Electrical infrastructure should be provided so that all car parking spaces can have electric charging points installed in the future.

 

Six representations have also been received raising the following material considerations:

 

- the proposal will lead to overlooking of properties in Ringside and loss of privacy

- the height or proximity of the development will lead to a loss of daylight

- the scale of the proposed development will have an oppressive impact on nearby properties

- noise from the building works, flats and commercial units will be overwhelming to the already loud area causing stress to current local residents.

 

-Potential noise, fumes and other odours could lead to a loss of amenities to existing residents in the area.

 

-The traffic on Market Street is already congested and will increase once the

Amber House development is completed.

 

- The development would be dangerous and evacuation from the buildings in case of fire would be difficult due to the limited number of stair wells.

 

 

7. SUMMARY OF CONSULTATION RESPONSES

 

Tree Officer

 

7.1. The approach of clearing all trees on site and treating the site as a blank canvas is not the most sympathetic approach in terms of trees.  Attempts should be made to retain trees where possible and ensure that tree planting is viable on the site.  Tree planting should be specifically engineered using a Silva cell type construction concept. The walkway to the Peel Centre should become a soft landscaped area which would be more environmentally beneficial and aesthetically sympathetic.  This would also provide a far more conducive growing environment to sustain new trees and provide opportunity for additional eye level shrub or hedge planting.

 

Landscape Officer

 

7.2 The principle of the proposed landscape scheme is acceptable. Further details are required to be submitted as a condition. In particular, it will be important to ensure that there is no conflict between drainage and tree pits and that tree planters can be maintained on the site.

 

Biodiversity Officer

 

7.3 Subject to details of landscaping being secured to ensure planters are retained on site and the provision of a landscaped strip along the site boundary with Market St and the plaza between Market St and the Peel Centre, the application is acceptable subject to conditions and s106 requirements.

 

Highways Officer

 

7.4 No objection subject to conditions and S106 requirements.  Concerns expressed that the site requires the use of off-site car parks by residents and that this requires some form of control by the Council as owners of public car parks within the town centre to ensure that the parking spaces are available to residents of the site in perpetuity.

 

Drainage Officer

 

7.5 No objection subject to condition.

 

8. MAIN POLICIES AND OTHER DOCUMENTS RELEVANT TO THE DECISION

 

8.1 The key policies and associated guidance applying to the site are:

 

 

 

 

Development Plan

NPPF

Weight to be attributed, with reference to para.

213 of NPPF

Sustainable development principles

SALP Policy CP1

 

 

 

 

 

 

 

 

 

 

 

CSDPD Policy CS1

Para. 11(d) refers to ‘policies which are most important for determining the application are out-of- date’. CP1 wording differs to this.

Furthermore, the PPG states that there is no need for a policy to directly replicate para. 11.

Consistent (Paras. 7, 8,

11, 12, & 117 - 119)

Limited (policy not used in planning application decision-making)

 

 

 

 

 

 

 

 

Full

Design           & Character

CSDPD Policy CS7

 

 

BFBLP ‘Saved’ Policy EN20

Consistent (Chapter 12)

 

 

Full

 

 

Full

Trees             &

Landscape

CSDPD Policies CS1 & CS7

 

 

BFBLP     ‘Saved’     Policies EN1, EN2 & EN20

Consistent (paras. 127

& 170) “

Full

 

 

Full

Residential Amenity

‘Saved’ Policies EN20 & EN25 of BFBLP

Consistent (paras. 127,

170 & 180)

Full

Transport

CSDPD   Policies    C23   

 

BFBLP ‘Saved’ Policies M8 & M9

Consistent (Chapter 9)

 

 

Full

 

 

Full

Drainage

CS1 of CSDPD

Consistent (paras. 163

& 165)

Full

Biodiversity

CSDPD Policies CS1 & CS7

 

 

BFBLP      ‘Saved’ Policies EN1, EN2 & EN20

Consistent (paras. 170

& 175)

 

Full

 

 

Full

Sustainability of build (Renewable Energy and

Water Use)

CSDPD Policies CS10 & 12

Consistent (para. 149)

Full

Supplementary Planning Documents (SPD):

 

Parking Standards SPD (2016)

 

Other publications:

 

National Planning Policy Framework (NPPF) (2019) National Planning Policy Guidance (NPPG) (2019)

 

 

 

 

 

9. PLANNING CONSIDERATIONS

 

9. 1 The key issues for consideration are:

 

i.          Impact on the character and appearance of the area.

ii.         Impact on Residential Amenities

iii.        Highways

iv.        Drainage

v.         Biodiversity

vi.        Community Infrastructure Levy (CIL)

vii.      Thames Basin Heaths Special Protection Area

viii.     Provision of Affordable Housing

 

These issues are considered in turn below:

 

i.          Impact on the character and appearance of the area.

 

9.1 The site is within Bracknell town centre and is located on Market Street which contains a mix of commercial and residential premises.  The development comprises 4 buildings ranging in height from 6 storeys in block D to 17 storeys in block A, which is positioned at the northern end of Market St. at its junction with Skimped Hill Lane. The height of the proposed blocks decreases from the maximum height in block A to 14 storeys in block B, 9 storeys in block C and 6 storeys in block D.  Winchester House, a 19 storey building, is positioned close to block A and will remain the tallest building within the town centre.  The positioning of taller blocks at the northern part of the application site allows for buildings to appear as a cluster with Winchester House together with Ocean House (a 13-storey building) when viewed on the approach into Bracknell from Skimped Hill Lane.  Block A acts as a focal point at the junction of Market St and Skimped Hill Lane but its height is stepped down on the western elevation to reduce the bulk and massing of the building when viewed together with the Point.

 

9.2 The height of buildings on the application site reduces from north to south. Immediately adjacent to the site is Amber House, currently under construction to provide a 9 storey building, reducing in height to 6 storeys.  The former bus station site also under construction would have a maximum of 10 storeys.

 

         

 

9.3 A Townscape and Visual Appraisal (TVA) has been submitted with the application. This document identifies and assesses the potential effects of the proposed development on the townscape character and visual amenity of the site and its surroundings.  The TVA records the existing townscape/landscape conditions and sets out how the townscape/landscape characteristics of the study area and the site interact.  A distance of approximately 2.5km from the site boundary was identified as an appropriate distance within which to consider the wider townscape/landscape setting of the site. Though the site may be visible from beyond this distance, at longer distances site features and precise boundaries will not be clearly defined.

 

9.4 Appendix 5 of the Tall Buildings policy LP43 in the emerging Local Plan sets out a viewpoints map with 11 specific viewpoints highlighted as key views relating to Bracknell Town. They are:

 

• TB1 (A329)

• TB2 (A329)

• TB3 (Peacock Lane)

• TB4 (Wokingham Road)

• TB5 (Johnstone Close)

• TB6 (Tilehurst Lane)

• TB7 (Binfield Road 1)

• TB8 (Binfield Road 2)

• TB9 (Cabbage Hill)

• TB10 (Sopwith Road)

• TB11 (Ascot Road)

 

9.5 Seven of these viewpoints were used in the TVA being within 2.5km of the site and the site being visible from them.

 

9.6 The TVA concludes that the proposals will result in a permanent and long-term change to the townscape character of the site due to the size and scale of the proposed development.  However, it is considered that the proposed development will have a negligible effect on the majority of the townscape/landscape character areas.  Within the site itself and the town centre the proposals are considered to have a beneficial effect in enhancing the site’s appearance and its immediate townscape setting.  The proposal will not have any significant adverse effects on visual amenity from the wider townscape and landscape.

 

9.7 The proposed height and scale of the development is considered to be acceptable.  In this town centre location, the buildings would be viewed as part of the cluster of existing tall buildings and the additional tall buildings currently in construction in the area.

 

9.8 The application proposes commercial uses at ground floor level, with residential above in blocks A, B and C.  Block D is in outline form only with commercial uses proposed on all floors.  This would provide active frontages at ground floor level for all blocks.  Buildings will be set back from Market St. behind trees within planters and a landscaped strip.  Trees will be provided in planters as a sewer currently running across the rear of the site will be re-located along the Market St boundary and a sewer easement across the front of the site restricts the planting of trees.  The landscaped strip will run behind the footway in Market St and allow for the building to be set back approximately 9m from the road. The main entrances to the blocks are from Market St.

 

9.9 The blocks would be brick built with each block constructed in a different brick tone with a contrasting lighter toned brick used to create horizontal and vertical bands within the elevations.  Block A will be a light toned brick, with darker toned bricks used in each block from north to south along Market St.  The top floors of the blocks will be constructed in a lighter toned brick to add further interest to the elevations and create horizontal emphasis. Textured brick panelling is used to add interest at lower floor levels and darker brick creates a visually contrasting base to the blocks to identify the commercial uses and add interest at street level for pedestrians.

 

View Along Market St.

 

9.10 Balconies are provided above the ground floor to add further design detail to the blocks and private outside amenity space to each apartment.

 

9.11 The decked car park to serve the development is to the rear of blocks B and C and is 4 storeys in height. The western elevation of the car park facing the Point will be articulated with textured brickwork and vertical greening panels to provide landscaping on the elevation and to soften the building when viewed from The Pont and Skimped Hill Lane.

 

9.12 Public realm between blocks A and B and blocks C and D will provide spacing between buildings and allow for views into the site.  The areas will be a mix of hard and soft landscaping with seating areas provided to allow use by residents and the public visiting the commercial uses within each block. 

 

9.13 The existing pedestrian link between the site and Amber House to the Peel Centre will be retained and enhanced with tree planting, overspill seating from the proposed café in block D, and a proposed table tennis table will improve the vitality of the linkway and provide an important public open area within the town centre.

 

9.14 Existing trees on the site will be removed.  New tree planting will take place within the public walkway to the Peel Centre, between buildings and along the boundaries of the site with Market St and Skimped Hill Lane.  Due to the restrictions of the sewer easement along Market St, trees along this frontage will be within planters. A tree planting masterplan has been provided to demonstrate that trees can be provided around the site. Further landscaping is proposed throughout the site to provide variety of planting. Details of landscaping can be secured through a landscaping condition.

 

9.15 The proposed development is considered to be acceptable in terms of character and appearance. The site is within Bracknell town centre and tall buildings are considered to be appropriate in this location.  The highest point of the building is at the junction of Market St and Skimped Hill Lane with height reducing southwards along Market St.  The provision of a key building at the position of block A, where the height will reflect the height of other town centre buildings is acceptable and the variation in height across the site together with the use of a variety of material colours will result in buildings that reflect the town centre location but are of a high quality of design.  The provision of landscaping and spacing between the buildings also contributes to breaking up the scale of development and adding interest at pedestrian level.  The application is acceptable in meeting the requirements of policies CS7 of the CSDPD and policies EN1 and EN20 of the BFBLP.

 

ii Impact on Residential Amenities

 

9.16 Market St includes a number of residential developments in Gowring House, Alston House and two that are currently under construction at the former Amber House and the depot sites.  In addition, Ringside which is located on the High St behind the BT telecom site is a residential apartment building that faces the application site although is at a distance of approximately 50m from the closest point of Ringside to the site boundary.  Concerns have been raised by residents in Ringside that the development, and particularly block A, would result in overlooking and overshadowing of their properties.  However, in the context of town centre developments it is not considered that the relative distances between properties would result in material loss of amenities to residents.  A distance of 30m is generally considered to be acceptable between taller residential properties to reduce any likely overlooking. 

 

9.17 The application includes Daylight and Sunlight Reports to assess the likely impact of the development on existing properties in the vicinity of the site and to assess if residents of the proposed development would have main living rooms that would receive acceptable levels of daylight and sunlight. The report relies on guidance in the BRE document entitled Site Layout Planning for Daylight and Sunlight – A Guide to Good Practice 2011 (the BRE guidelines). This document is the principal guidance in this area and while not statutory, it does set out the methodology for measuring light and recommends permissible or unobtrusive levels of change. In assessing the impact of the proposal on Winchester House, Amber House, Alston House and Ringside, the report considers the impact of the proposed development on 494 (or 96%) of 516 windows on these buildings.  It concludes that 323 (94%) of 342 rooms within the surrounding residential properties are not affected by the proposal. Many of the reductions in daylight and sunlight on windows are due to self-obstruction from balconies and overhangs and when these are removed (in accordance with the BRE guidelines) 511 of 516 windows (99%) are compliant, indicating that the relative losses are primarily a result of self-obstruction from their own design. The scheme is considered to display a very high degree of compliance with the BRE guidelines and high levels of retained daylight. The results indicate that daylight and sunlight levels surpass those normally expected in an urban environment and any losses of daylight are considered acceptable.

 

9.18 Within the development, the internal daylight amenity assessment has considered the first 3 residential floors in each of the 3 proposed residential blocks. By virtue of their lower location, these rooms are most likely to experience inferior light levels as compared to the upper floors which will have superior access to skylight. The assessment demonstrates that the proposed residential properties will enjoy full compliance with the BRE guidelines.

 

9.19 An area of open space for use by residents is provided behind block A.  This space will include trees and hard landscaping and will be large enough to act as an informal play area for residents.  Play equipment is not proposed for the space which would be available for informal leisure and as a seating area. Together with balconies for each apartment, the scheme will provide appropriate open space for residents.

 

9.20. The commercial floorspace in blocks A, B and C will fall within use classes E, F1 and F2 with final quantums to be flexible within the proposed use classes.  In order to ensure that future residents will be protected from the effects of noise from the commercial units and the specifications of any ventilation extraction units will be required to take account of the amenities of residents in terms of noise.  In addition, the site is located within the town centre close to major roads and the adjoining leisure facilities at the Point.  A Noise Impact Assessment has been submitted and noise mitigation measures, secured through a condition will be required to be submitted to ensure a satisfactory living environment for residents.

 

iii Highways

 

9.21 The site is located on Market Street on the site of the former bus station and more recently the area has been used as a yard for the Council's contractor for storage for materials for highway purposes.  Market Street is subject to a 30mph speed limit and is a well used road due to its location within the town and the links it provides to the bus and rail stations.

 

9.22 The site currently has one wide point of access close to the signalised crossing on Market Street opposite the parking layby.  The footway that runs past the front of the site is quite wide but would require further widening to make it suitable to be used by cyclists as well as pedestrians.  Adjacent to the southern boundary of the site is the pedestrian link to The Peel Centre and The Point which located behind the site to the West.

 

9.23 The proposal seeks to utilise the existing access with some minor modifications to its position as well as creating a new access approximately 35m from the stop line of the traffic signals. This new access point is to be used as an exit only due to the limited turning space on site and the requirements for deliveries to pass through the site from the south, and a Traffic Regulation Order will be required to control access at this point. With that in mind the position of the access in relation to the traffic signals is acceptable.

 

9.24 It is also clear from the submission that the proposed layout will only allow a certain size of delivery vehicle to the site due to the scale of the access proposals. The maximum size of vehicle is large enough for the proposed uses on the site and would include refuse vehicles but planning conditions would need to be in place controlling deliveries to the site. Some of the proposed commercial uses may lead to larger vehicles visiting the site. This mainly relates to the food store proposals.

 

9.25 In relation to the design of the internal access roads the current designs appear to provide for a wide open expanse of paving with some specific limited areas of planting and trees. In relation to the southern access road, this route has to accommodate vehicles, pedestrians, deliveries and some control equipment for the ramp into the car park.  The set down location for deliveries which would serve block D and one end of blocks B and C has been defined within this space and allows for vehicles to wait without obstructing the traffic light system that controls access to the ramp to the decked car park behind blocks B and C. The one way nature of the multi storey car park ramp means that traffic is to be controlled at ground floor level.

 

9.26 In relation to the northern access, the design issues are similar in terms of the design of the space and location of delivery areas.  Block A is likely to house the food retail unit that is being sought and thus more frequent deliveries would be expected to such a store even though this unit may be smaller in scale a dedicated delivery bay has been provided in this area.

 

9.27 In relation to the frontage of the site, the applicant has indicated a sliver of land that can be dedicated as public highway to provide a minimum 3m footway/cycleway space across the frontage of the site.  This could tie into wider changes planned along Market Street as well as the existing infrastructure on Skimped Hill Lane. This provision is welcomed and should be dedicated as highway as part of the S278 highway works required to form the entrances on Market Street.

 

9.28 The doors to the cycle and refuse stores should either be roller shutter type or open inwards to ensure they do not conflict with a vehicle passing by within the undercroft. The door to the commercial refuse store needs to be increased in width to allow for access for the larger bins. The parking spaces (9 and 10) in the undercroft

are tight to manoeuvre into and out of due to the position of the space being adjacent to a pillar.  In reality this could lead to a vehicle parking outside of the parking space which could restrict access for deliveries.  With the change to the doors to the stores it may be possible for a vehicle to pass closer to the building safely and further away from the parking bays allowing the bays to be repositioned similar to those on the upper levels of the car park.

 

9.29 In relation to the pedestrian route that runs adjacent to the southern boundary of the site and links to the Peel Centre, the route is open on the Market Street frontage and the inclusion of 1 tree does not remove the potential for pedestrians and cyclists to conflict at this point. Further alterations are required to this area and the details could be conditioned.

 

9.30 More formal planting and trees are required to direct pedestrians to the crossing point. The design of the widened path across the site frontage to provide the opportunity for a new cycleway along Market Street to be provided will need to be designed in detail.  This is because the current controlled crossing is only suitable for pedestrians and so cyclists will need to dismount at this point.  Such matters can be dealt with under a section 278 highways agreement .  However, the need to secure a revised adopted route from Market Street to the Peel Centre of at least 3m wide to enable future pedestrian and cycle access will need to be covered by an obligation in a section 106 agreement.  Such a route will need to be defined through the open area proposed.

 

 

Parking

         

 Commercial parking

 

9.31 There are various uses proposed within the use class being sought under this application some of which may be more suitable for this location.  The current description of development currently includes the provision of community type uses. Such uses bring with them specific patterns of use with the potential for a lot of people to arrive over a limited period.  This could lead to a significant amount of drop

off/pick up within the site which could impact on the safe operation of the site.  No parking is proposed on site for the commercial uses. Any commercial uses should be capable of being used safely without on site parking or drop off facilities, Transport work that has been carried out by the applicant has focussed on specific uses and floor areas and the demand that could arise against our parking standards.  These uses include office, gym and food retail uses.  It is recognised that non-food retail uses may also occur within some of the buildings proposed and for such scale the standard required is the same as food retail.

 

9.32 The road design adjacent to this unit within the site is such that indiscriminate parking would not be possible as it would block the road and there is a loading bay adjacent that would serve such a use.  Parking on Market Street is restricted, although there are some on street time limited bays that provide some capacity.  Further spaces are to be provided once the Amber House development is complete and this will provide some parking stock for the retail uses in the area.

 

9.33 Such parking provision along with on site management should help cater for demand for parking and other nearby parking facilities could also be used.  With that in mind the Local Planning Authority3are advised to consider restricting the scale of the food retail use to the floor area indicated (318m2) to ensure the scale of the use does not increase

demand too significantly on the surrounding area.

 

9.34 In regard to the Gym use that could occur on the site, this appears to be within blocks B&C (Approx. 510m2) and this would require a total of 13 parking spaces. Again, no parking is provided but such a use could be accommodated within local car parks.  Typical peak demand for such a use occurs in the early morning and evenings before or after more general peak demand has occurred and at weekends when use varies throughout the day. It should also be remembered that trips to such facilities may be linked with another trip such as shopping or work.  In that regard some of the demand on the local car parks may in reality already be in place as part of another trip.

 

9.35 Block D is a self-contained block and appears to be set aside for an office use as well as other community uses.  An office type use as defined by the applicant would generate the need for 67 parking spaces against BFC parking standards and these would need to occur in nearby car parks.  This is not uncommon for such a

use and there would appear to be capacity in many of the surrounding car parks to cater for such a need.  In addition, trips to such facilities are part of a specific trip purpose and those making the journey will plan in advance the mode of travel they wish to use when knowing what options to travel are available.  Furthermore,

with the location of the site in close proximity to the rail and bus stations, along with the more recent changes to working practices of office workers, the actual demand that may arise from this specific use could be less.  A travel plan would be required for an office development of this scale that could also help to control/reduce demand in the longer term. This form of the building (multi storey) is such that this is the most

realistic use.

 

9.36 Overall, it is felt that the commercial uses on the site with specific controls and restrictions as well as a travel plan are unlikely to lead to operational issues or provide a demand on local car parking that cannot be accommodated either as part of a specific trip or that associated with a trip already made.

 

Residential Parking

 

9.37 The proposed site currently provides a total of 89 parking spaces and two car club spaces (91 overall). 89 parking spaces equates to 0.53 spaces per dwelling. This level of parking is below the 0.9 parking spaces per dwelling average that is set out in the town centre parking standards. The parking is made up of a small amount of parking at ground floor and three levels of car parking access via a controlled ramp. Two additional parking spaces are provided on site which are specifically for a car club that will help increase the options for residents who choose not to own a car but would like access to one. Evidence suggests that for every car club space provided, the equivalent of 9 parking spaces are realised. Taking this into account the equivalent of 107 parking spaces would be provided creating an equivalent ratio of 0.63 spaces per dwelling.

 

9.38 This ratio is still lower than the town centre standard and below parking levels provided on similar sites in close proximity to this site. The Amber House site provided an overall ratio of 0.89 spaces per dwelling and the Coldborough House site provided a ratio of around 0.77 spaces per unit, with the inclusion of 3 car club spaces to aid in making up the shortfall in the ratio against current standards.

 

9.39 In respect of this application, it is recognised that the shape of the site and the inclusion of a major sewer running across the site are constraints that could well impact on the parking provision that would be possible on site.  Furthermore, the planning considerations of further decks to the car park need to be considered in terms of the visual appearance of the scheme.  Both these considerations limit the potential for further parking on the site which would reduce the reliance on any off site parking. Increasing the car club spaces to three would help reduce the shortfall slightly.

 

9.40 With the current scheme as proposed, a ratio of 0.27 spaces per dwelling or the equivalent of 46 parking spaces would need to be accommodated in other lawful areas. The applicant indicates that this would be in local car parks near to the site but these are not within the application site so cannot be controlled. As this is a joint venture site with the applicant and the Council, if there is any form of planning control that could deliver the remaining ratio off site in perpetuity then the highway authority would be willing to provide further comment.  Whilst off-site provision may well be a potential solution, the Highway Authority remains concerned at present that such a departure from the current standards could set a precedent for other residential developments around the town centre and adjacent areas.  This could lead to further pressure on parking stock within the town centre over time or overspill parking in the roads surrounding such developments. No up to date survey information has been presented to support such a departure.

 

9.41 From observations of similar developments affordable housing generally has a lower parking demand than private housing. However the level of affordable housing within the site is no higher than policy compliant (25%) and so the impact on likely parking demand is expected to be nominal. The applicant has introduced some motorcycle parking spaces within the car park deck on floors 1 and 2 and this

will provide 8 spaces for use by the residents and this will provide an option for those who want an alternative to a car.

 

9.42 A travel plan for the residential development will be required and measures within such a plan could help support alternative travel to the car such as free bus or rail passes for new residents as well as discounted access to the car club. Such measures could be investigated to further support travel by non car modes and included in any revised Travel Plan.

 

9.43 Disabled car parking has been provided on site to the town centre standards with spaces provided on all levels of the decked car park. However, it is noted that the parking spaces on the upper levels of the car park do not have the transition space adjacent to the driver’s side, it is advised that this is altered and, in that regard, the

space adjacent would also have the ability to be used by a disabled person, especially a passenger in a vehicle.

 

9.443 A lift is to be included within block B that can be accessed via the car park and this will aid in any disabled person or parent with a push chair etc. gaining safe and easy access out of the car park to the building entrance.

 

9.45 A car park management plan for the site will be required, not only to set out the control of the access and traffic light system but also to set out how the parking stock will be distributed across the development and how future residents that would not be eligible for a parking space are treated and informed prior to purchase. Parking spaces must be fairly and reasonably controlled so as not to lead to future residents being displaced and parking elsewhere. Furthermore no one flat should have access to more than 1parking space or permit.

 

 9.46 It is recognised that around the site there are suitable parking controls in place to restrict long term parking and internal controls will also be in place as secured through the car park management plan to restrict parking. However, such restrictions are only as good as the enforcement of them and unlike commercial uses which generally have the greatest demand during the day, residential demand can occur during the night. In that regard there is more potential for some parking to be displaced onto the widened footway adjacent to the site at night. Should such a situation arise then further

physical measures may need to be introduced to protect the route.

 

9.47 Overall, the Highway Authority recognise the constraints this site has and this will impact on the level of on site parking that can be provided. Whilst flexibility has been given over the commercial uses concern is still raised in relation to the precedent the residential element may set if control of off site parking cannot be achieved. However such matters should be considered in the round and balance the need between levels of parking against other planning matters and the delivery of housing.

 

Cycle parking

 

9.487 Parking to standards for the residential element has been provided, however for the types of rack proposed some minor alterations to the layout of the cycle parking will be required. This can be dealt with by condition, with details to be submitted prior to

commencement to ensure any minor building changes that may be required are factored into the design process. Cycle parking for the commercial uses will also be conditioned.

 

Traffic Impact

 

9.49 Information submitted indicates the level of trips is limited in the peak hours and spread across the network assuming that some of the activity takes place from town centre car parks as the applicant is relying on parking occurring here for the residential and commercial elements. The assessment also reflects the commercial uses set out in the parking section above and in that regard, it is anticipated that activity levels on Market Street from the site would generate approximately 43 two way trips in both the AM and PM peak hour. A further 53 two way trips and 94 two way trips in the AM and PM peak hours respectively would be expected on the wider town centre network from the remaining residential and commercial traffic. This would be spread out across the wider road network and junctions depending on which of the various routes are used to access the various car parks. Furthermore the town centre regeneration proposal did

previously consider development on this site for various uses and although the consent has now lapsed it does indicate that development on this site was considered and the relevant junction improvements around the town centre were delivered to provide suitable mitigation. It is also recognised that this site has been included in the Emerging Local Plan for residential development and so a consideration of the impact into the future has also been undertaken. A financial contribution to wider transport improvements will be sought to deal with the cumulative impact of the development on the surrounding network. Such matters will be dealt with via an agreement pursuant to section 106 of the Town and Country Planning Act 1990.

 

Conclusion

 

9.50 The Highway Authority has concerns about the residential parking provision for this proposal and the precedent it could set for other residential development in and surrounding the town centre. Should it be possible to lawfully secure off site parking then this concern could be overcome.

 

iv Drainage

 

9.51 A Site- Specific Flood Risk Assessment (FRA) has been undertaken for the proposed development. This FRA has been prepared in compliance with guidance given in the National Planning Policy Framework (NPPF) (February 2019) with the latest relevant Planning Practice Guidance.

 

9.52 The FRA finds that the Environment Agency Risk of Flooding from Rivers and Sea map indicates that the proposed development site is situated in Flood Zone 1, which is an area of the lowest risk of flooding. The overall risk of flooding from other sources at the site is low.   Therefore overall, the flood risk due to this development is assessed to be low. Part of the site which includes Block D included in the outline planning application is shown to be located within an area at medium risk of flooding according to Environment Agency Mapping.  A surface water drainage strategy has been submitted which demonstrates that flooding on site would be contained within the site boundary, and that the flow path along Market Street would not be impeded by the development. Hydraulic modelling of the overland flow paths should be carried out before the reserved matters for Block D are approved to ensure that flooding is not increased elsewhere and that the development would not be at significant risk of flooding.

 

9.53 A pre-application capacity check has been sent to Thames Water to ascertain if they have   sufficient   capacity   in   their   existing   sewers   for   the   proposed development.  There is sufficient capacity for the surface water system.  Thames Water need to model the foul system to confirm the capacity and will not proceed until planning permission has been granted.

 

 

9.54 The proposed development requires the diversion of existing surface water sewers. Thames Water have given an Approval in Principle based on preliminary information, but a detailed application will need to be submitted to Thames Water for approval.

 

v  Biodiversity

 

9.55 Green infrastructure that allows for the permeability of the urban environment for wildlife is important in this town centre location as part of an ecological network. Requiring resilient ecological networks is in line with paragraph 174 of the NPPF and LP16 of the emerging Local Plan.

 

9.56 The existing vegetation though poor in condition and mainly comprising non-natives does still provide refuges and links both along Market Street (north-south) and across what will become the plaza (east-west) at the southern end of the site.

         

9.57 The current design removes the soft ground of the plaza corridor and replaces it with moveable planters. These are unlikely to provide the same biodiversity value as the existing vegetation due to the limited physical structure and removing the connection with the ground such that most terrestrial species will be unable to use them. However a strip of land is shown to be provided for a planted corridor along the plaza.  

 

9.58 Section 4.28 of the Preliminary Ecological Appraisal (PEA) values the existing scrub/shrub habitat for birds as low. However, given the urban environment, this vegetation is likely to provide dense cover suitable for nesting birds that is relatively uncommon in the local area. The new planting on the western boundary may provide some nesting habitat in the long term and the planting strip along the southern boundary could also provide shrub cover in a continuous band.

 

9.59 Section 5.9 of the PEA suggests that bird boxes should be included within landscaped areas as well as on buildings which would help in supporting a wider range of species. New bird boxes may need to be a free-standing design if all the existing trees are removed as currently proposed and these should be shown on scaled landscape drawings. New bird boxes on the buildings should use integrated swift bricks at various heights which have been shown to accommodate a number of different species.

 

9.60 The proposed native hedgerow on the western boundary is welcome but it has much reduced value if a large section in the middle is replaced with climbers unless those produce fruit and flowers. This information can be provided through a landscape condition. The PEA also recommends the use of invertebrate habitat features within soft landscaping in suitable, sunny locations.

 

9.61 The use of moveable planters to provide tree planting over a relocated sewer easement is innovative but there may be uncertainty over the long term viability of these structures so they should be secured through a S106 agreement.

 

9.62 Biodiversity Impact Assessment predicts a net gain of 74.43% (0.68 units) based on the provision of green roofs (biosolar), landscaping and street trees. In addition, the design would provide 50 metres of new hedgerow which is measured as a 100% increase, although there is an existing low non-native hedgerow of 100 metres around the periphery of the site which may provide some similar, though poorer function. It is acknowledged that the predicted Biodiversity Net Gain is well in excess of the 10% requirement.

 

vi Community Infrastructure Levy (CIL)

 

 

 9.63 Bracknell Forest Council introduced charging for its Community Infrastructure Levy (CIL) on 6th April 2015.  CIL is applied as a charge on each square metre of new development. The amount payable varies depending on the location of the development within the borough and the type of development.

 

9.64 CIL applies to any new build (except outline applications and some reserved matters applications that leave some reserved matters still to be submitted), including extensions of 100 square metres of gross internal floor space, or more, or new build that involves the creation of additional dwellings.

 

9.65 CSDPD Policy CS6 states that development is expected to contribute to the delivery of: -

(a) infrastructure needed to support growth and;

(b) infrastructure needed to mitigate impacts upon communities, transport and the

environment.

 

9.66 Guidance in the Planning Obligations SPD is relevant. Bracknell Forest Council

Community Infrastructure Levy (CIL) is applied as a charge on each square metre of new development. The amount payable varies depending on the location of the development within the borough and the type of development. It applies to any new build but in the case of outline applications is calculated when reserved matters are submitted. In the case of this application, CIL is calculated at the reserved matters stage.

 

9.67 The application site is within the Central Bracknell charging zone with a Nil charging rate.

 

vii Thames Basin Heath Special Protection Area

 

9.68 The Council, in consultation with Natural England, has formed the view that any net increase in residential development between 400m and 5km straight-line distance from the Thames Basin Heath Special Protection Area (TBH SPA) along with any larger developments comprising over 50 net new dwellings within the 5 - 7km zone is likely to have a significant effect on the integrity of the TBH SPA, either alone or in-combination with other plans or projects. An Appropriate Assessment has been carried out for this proposed development in accordance with Conservation of Habitats and Species Regulations 2017 (as amended).

 

9.69 This site is located between 400m and 5km from the boundary of the SPA and

therefore is likely to result in an adverse effect on the TBH SPA unless it is carried out together with appropriate avoidance and mitigation measures.

 

9708 On commencement of the development, a contribution (calculated on a per-bedroom basis) is to be paid to the Council towards the cost of measures to avoid and mitigate against the effect upon the TBH SPA, as set out in the Council's Thames Basin Heaths Special Protection Area Supplementary Planning Document (SPD). The strategy is for relevant developments to make financial contributions towards the provision of Suitable Alternative Natural Greenspaces (SANGs) in perpetuity as an alternative recreational location to the SPA and financial contributions towards Strategic Access Management and Monitoring (SAMM) measures. The Council will also make a contribution towards SANG enhancement works through Community Infrastructure Levy (CIL) payments whether or not this development is liable to CIL.

 

9.71 In this instance, the development would result in a net increase of 55 x 1bedroom, 105 x 2-bedroom and 9 x 3-bedroom dwellings within the 400m – 5km TBH SPA buffer zone which results in a total SANG contribution of £756,422.

 

9.72 The development is required to make a contribution towards Strategic Access        Management and Monitoring (SAMM) of £105,691 which is also calculated on a per          bedroom basis.

 

9.73 The total SPA related financial contribution for this proposal is £862,113 payable    on completion of the s106 Agreement.

 

9.74 The applicant must agree to enter into a S106 agreement to secure this                  contribution and a restriction on the occupation of each dwelling until the Council has      confirmed that open space enhancement works to a SANG is completed. Subject to the       completion of the S106 agreement, the proposal would not lead to an adverse effect on        the integrity of the SPA.

 

viii     Provision of Affordable Housing

 

 

9.75  Saved Local Plan Policy H8 states that the Council will require an appropriate proportion of affordable housing on identified major housing allocations and other sites where development would result in a net increase of 25 or more dwellings, or on a site which is over one hectare in size irrespective of the number of dwellings.

 

9.76 The Planning Obligations SPD makes reference to Policy CS17 (Affordable Housing) of the Core Strategy along with the subsequent decision of the Council Executive (March 2011). This sets out that proposals providing 15 net additional homes will be required to meet a provision of up to 25% of net new homes to be affordable, subject to viability. With regard to tenure split, the Council will seek 70% to affordable rent and 30% to be intermediate housing.

 

9.77 The Application seeks to deliver a policy compliant level (25%) of affordable housing. The Scheme will deliver a total of 42 units, which will come forward as 29 Affordable Rent Units and 13 Shared Ownership. This equates to a policy compliant tenure split of 70% affordable rented units and 30% intermediate housing.

 

9.78 Of the 42 affordable units proposed, 28 of the units are two bedroom units and 14 one bedroom units.

 

9.79 The provision of affordable housing will be secured through a S106 agreement.

 

10. CONCLUSIONS

 

10.1 The site is within Bracknell town centre where development to meet a range of needs including residential and Class E and F uses of offices, retail, and a gym are considered to be acceptable in principle.  The site is proposed to be allocated in the Emerging Local Plan for 141 dwellings net and 4,700sqm commercial floorspace. The proposed development in this application is for 169 dwellings and 3549sq.m commercial floorspace and this is considered to be broadly in line with the principles of the proposed allocation.  Affordable housing is to be provided to meet the current policy requirement of 25% of units to be affordable with 29 to be affordable rent capped at social rent and 13 shared ownership.

 

10.2 A total of 89 parking spaces will be provided on site within a decked car park positioned behind blocks B and C with 82 parking spaces provided off site within town centre car parks to give a total of 171 parking spaces to serve the development. There will also be 2 car club spaces provided on site which can be assessed as increasing the on-site provision by 18 spaces. Parking is provided at a ratio of 0.51 spaces per dwelling taking into account on site parking provision (without car club) and 0.63 spaces per dwelling including the 2 car club spaces. When off site parking is taken into account parking meets to town centre parking standard 0.9 spaces per dwelling. Adequate cycle parking and refuse storage facilities are provided.

 

10.3 The development includes 4 blocks, ranging in height from 17 storeys at the northern point, reducing to 6 storeys adjoining Amber House.  This is considered to be acceptable on this town centre site.

 

10.4 The proposal would not adversely affect the residential amenities of neighbouring

occupiers and acceptable living conditions would be provided for future occupiers of the dwellings.

 

10.5 The development will be set back from Market St behind a landscaped strip to include trees within planters and includes an enhanced walkway from Market St to the Peel Centre.  The courtyards between blocks A and B and between blocks C and D allow for spacing between buildings and views into the site and will include hard and soft landscaping.  An area of open space for residents is also included behind block A. Although the site currently includes trees, which will be removed, they are not trees of significant quality and the development does allow for a structures landscaping strategy to be provided to enhance the landscaping of the site.

 

10.6 Biodiversity Net Gain will be well in excess of the 10% requirement.

 

10.7 A legal agreement pursuant to S106 of the Town and Country Planning Act 1990 is required to secure contributions for SPA mitigation, affordable housing, Biodiversity Net Gain, a Travel Plan and highway requirements.

 

10.8 The application is therefore recommended for approval, subject to the completion of a section 106 agreement. It is therefore considered that the proposed development complies with Development Plan Policies SALP Policy CP1, CSDPD Policies CS1, CS2 and CS7, BFBLP 'Saved' Policies EN20 and M9, and the NPPF.

 

 

11. RECOMMENDATION

 

Following the completion of a legal agreement under section 106 of the Town and Country Planning Act 1990 to secure planning obligations   relating to:

 

i. Measures to avoid and mitigate the impact of residential development upon the

Thames Basins Heath SPA

ii. provision of the agreed standard of affordable housing;

iii  terms to ensure that the outline part of the application maintains the predicted biodiversity net gain in Reserved Matters.

iv  terms to secure contribution for monitoring biodiversity net gain for 30 years (0.31 ha)

v        Terms to secure maintenance and replacement of moveable planters for the life of the development

vi       The requirement to enter into legal agreements pursuant to section 278 and section 38 of the Highways Act 1980 for the highway works along Market Street to create vehicle access and a widened footway as well as providing a new public link to the Peel Centre suitable for pedestrians and cyclists.

vii      A financial contribution towards transport infrastructure to mitigate the impact of the development.

viii     A financial contribution towards a new Traffic Regulation Order in relation to a movement restriction at the new egress to the site at the northern end of the site.

ix       A travel plan for the commercial and residential elements of the proposal.

x.       A financial contribution towards Active and Passive Open Space of Public Value

xi       A financial contribution towards community facilities

 

The Assistant Director: Planning be recommended to APPROVE the application subject to the following conditions amended, added to or deleted as the Assistant: Director: Planning considers necessary:

 

01.           Applications for approval of the first Reserved Matters shall be made to the Local Planning Authority before the expiration of three years from the date of this permission. REASON: To comply with Section 92 of the Town and Country Planning Act 1990

.

02.  The development approved by Reserved Matters shall begin no later than the expiration of three years from the final approval of the reserved matters for that Phase, or, in the case of approval on different dates for a single Phase, the final approval of the last such matter to be approved.

REASON: To comply with Section 92 of the Town and Country Planning Act 1990.

 

03.  No development shall take place until a plan identifying the extent of each Phase or Sub-phase has been submitted to and approved in writing by the Local Planning Authority.

REASON: In the interests of the proper planning and comprehensive delivery of the site and associated infrastructure.

[Relevant Policies: BFBLP EN20, CSDPD CS5 and CS7]

 

04.  Phase 1 of the development hereby permitted shall be begun before the expiration of three years from the date of this permission.

REASON: To comply with Section 91 of the Town and Country Planning Act 1990.

 

05. The development hereby permitted shall be carried out only in accordance with the following approved plans received by the Local Planning Authority on 17.12.2021

          MAR-CGL-ZZ-ZZ-DR-A-000001 R2

          MAR-CGL-ZZ-00-DR-A-050001 R5

MAR-CGL-ZZ-01-DR-A-050002 R3

MAR-CGL-ZZ-02-DR-A-050003 R3

MAR-CGL-ZZ-03-DR-A-050004 R3

MAR-CGL-ZZ-03-DR-A-050005 R2

MAR-CGL-ZZ-03-DR-A-050006 R2

MAR-CGL-ZZ-03-DR-A-050007 R2

MAR-CGL-ZZ-03-DR-A-050008 R2

MAR-CGL-ZZ-03-DR-A-050009 R2

MAR-CGL-ZZ-03-DR-A-050010 R3

MAR-CGL-ZZ-03-DR-A-050011 R3

MAR-CGL-ZZ-03-DR-A-050012 R3

MAR-CGL-ZZ-03-DR-A-050013 R3

MAR-CGL-ZZ-03-DR-A-050014 R3

MAR-CGL-ZZ-03-DR-A-050015 R2

MAR-CGL-ZZ-03-DR-A-050016 R2

MAR-CGL-ZZ-03-DR-A-050017 R2

MAR-CGL-ZZ-LG-DR-A-050000 R2

MAR-CGL-ZZ-RF-DR-A-050018 R2

MAR-CGL-ZZ-ZZ-DR-A-000003 R2

MAR-CGL-ZZ-ZZ-DR-A-060001 R4

MAR-CGL-ZZ-ZZ-DR-A-060002 R4

MAR-CGL-ZZ-ZZ-DR-A-060003 R3

MAR-CGL-ZZ-ZZ-DR-A-060004  R4

MAR-CGL-ZZ-ZZ-DR-A-060005 R2

MAR-CGL-Z1-ZZ-DR-A-060100 P2

MAR-CGL-Z1-ZZ-DR-A-060101 P2

MAR-CGL-Z1-ZZ-DR-A-060102 P2        

MAR-CGL-Z1-ZZ-DR-A-060103 P2

MAR-CGL-ZZ-00-DR-A-050200 R4

MAR-CGL-ZZ-00-DR-A-050201 R4

MAR-CGL-ZZ-00-DR-A-050204 R4

MAR-CGL-ZZ-01-DR-A-050202 R3

MAR-CGL-ZZ-01-DR-A-050203 R2

MAR-CGL-ZZ-00-DR-A-050100 R5

MAR-CGL-ZZ-ZZ-DR-A-060100 R4

MAR-CGL-ZZ-ZZ-DR-A-060101 R4

LN00625 L-100 P07

LN00625 L-101 P11

 

Market Street Flood Risk Assessment And Drainage Strategy (including SuDS Assessment)

 

          Former Bus Depot Site, Market Street Energy Statement

          Former Bus Depot Site, Market Street Sustainability Statement

REASON: To ensure that the development is carried out only as approved by the

Local Planning Authority.

 

06     No development above slab level for each phase shall take place until samples of the materials to be used in the construction of the external surfaces of the development hereby permitted, to include bricks and roof materials have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details.

REASON: In the interests of the visual amenities of the area.

[Relevant Policies: BFBLP EN20, Core Strategy DPD CS7]

 

07.Prior to the commencement of development for each phase details are to be submitted and approved in writing by the Local Planning Authority, to accommodate the following:

(a) Parking of vehicles of site personnel, operatives and visitors

(b) Loading and unloading of plant and vehicles

(c) Storage of plant and materials used in constructing the development

(d) Wheel cleaning facilities

(e) Temporary portacabins and welfare for site operatives

and each facility shall be retained throughout the course of construction of the

development, free from any impediment to its designated use. No other areas on the site, other than those in the approved scheme shall be used for the purposes listed (a) to (e) above

REASON: In the interests of amenity and road safety.

 

08.  A landscape and ecological management plan (LEMP) shall be submitted to, and approved in writing by, the Local Planning Authority prior to the practical completion of each phase of the development. The content of the LEMP shall include the following:

a) Description and evaluation of features to be managed

b) Ecological trends and constraints on site that might influence management

c) Aims and objectives of management

d) Appropriate management options for achieving aims and objectives

e) Prescriptions for management actions

f) Preparation of a work schedule (including an annual work plan capable of being rolled forward over a five-year period)

g) Details of the body or organization responsible for implementation of the plan

h) On-going monitoring and remedial measures

 

The LEMP shall also include details of the legal and funding mechanism(s) by which the long-term implementation of the plan will be secured by the developer with the management bodies responsible for its delivery.  The plan shall also set out (where the results from monitoring show that conservation aims and objectives of the LEMP are not being met) how contingencies and/or remedial action will be identified, agreed and implemented so that the development still delivers the fully functioning biodiversity objectives of the originally approved scheme.

The approved plan will be implemented in accordance with the approved details.

REASON: In the interests of nature conservation.

[Relevant Plans and Policies: Core Strategy CS1]

 

09.Prior to the commencement (excluding demolition) of each phase a scheme for the provision of biodiversity enhancements (not mitigation), including a plan or drawing showing the location of these enhancements, shall be submitted to and approved in writing by the Local Planning Authority. An ecological site inspection report shall be submitted within three months of the first occupation of any dwelling hereby approved confirming the implementation of the approved enhancement measures.

The approved scheme shall be performed, observed and complied with.

REASON: In the interests of nature conservation.

[Relevant Plans and Policies: Core Strategy CS1]

 

10. Prior to the commencement of each phase (including demolition and site clearance) a Construction Environmental Management Plan (CEMP) to control the environmental effects of the demolition and construction work shall be submitted to and approved in writing by the Local Planning Authority. The CEMP shall include measures for: -

(ï)      - the control of noise (including noise from any piling and permitted working hours)

(ii)      control of dust, smell and other effluvia

(iii)     the control of pests and other vermin (particularly during site clearance)

(iii)     control of surface water run off

(iv)    site security arrangements including hoardings

(v)     proposed method of piling for foundations

(vi)    construction and demolition working hours

(vii)    The control of noise from delivery vehicles, hours during the construction and demolition phase, and times when delivery vehicles or vehicles taking materials are allowed to enter or leave the site.

Construction activity shall be carried out in accordance with the approved CEMP.

REASON: In the interests of the amenities of the area.

11.Prior to the occupation of each phase of the development hereby permitted comprehensive details of both hard and soft landscaping works shall be submitted to and approved in writing by the Local Planning Authority. These details shall include:

 

a)    Comprehensive planting plans of an appropriate scale and level of detail that provides adequate clarity including details of ground preparation and all other operations associated with plant and grass establishment, full schedules of plants, noting species, and detailed plant sizes/root stock specifications, planting layout, proposed numbers/densities and locations.

 

b) Details of semi mature tree planting.

c) Comprehensive 5 year post planting maintenance schedule.

d) Underground service (drainage, power, communications cables, pipelines etc. indicating lines, manholes etc.) and external lighting layout to include existing reused and proposed new routes.

e) Means of enclosure (walls and fences etc)

f) Paving including pedestrian open spaces, paths, patios, proposed materials and construction methods, cycle routes, parking courts, play areas etc. and



Prior to the occupation of each phase of the development hereby permitted, all planting associated with that phase shall be carried out and completed in full accordance with the approved scheme, in the nearest planting season (1st October to 31st March inclusive) to the completion of the phase of the development or prior to the occupation of any part of the approved development, whichever is sooner. All hard landscaping works associated with a phase of the development shall be carried out and completed prior to the occupation of that phase of the approved development. As a minimum, the quality of all hard and soft landscape works shall be carried out in accordance with British Standard 4428:1989 'Code of Practice For General Landscape Operations' or any subsequent revision. All trees and other plants included within the approved details shall be healthy, well formed specimens of a minimum quality that is compatible with British Standard 3936:1992 (Part 1) 'Specifications For Trees & Shrubs' and British Standard 4043 (where applicable) or any subsequent revision. Any trees or other plants which within a period of 5 years from the completion of the development, die, are removed, uprooted, are significantly damaged, become diseased or deformed, shall be replaced during the nearest planting season (1st October to 31st March inclusive) with others of the same size, species and quality as approved by the Local Planning Authority

 

 

REASON: In the interests of good landscape design and the visual amenity of the area.

[Relevant Policies: BFBLP EN2 and EN20, CSDPD CS7]

 

12.The development hereby permitted shall be implemented in accordance with the submitted Sustainability Statement and shall be retained in accordance therewith.

[Relevant Policy: Core Strategy DPD CS10]

 

13.The development hereby permitted shall be implemented in accordance with the submitted Energy Statement and shall be retained in accordance therewith.

REASON: In the interests of sustainability and the efficient use of resources.

[Relevant Plans and Policies: CSDPD Policy CS12]

 

 

14. No development (other than the construction of the access or any temporary access required for the construction period) shall take place until the access to the site has been constructed in accordance with details to be submitted to and approved in writing by the Local Planning Authority.

REASON: In the interests of highway safety.

[Relevant Policies: Core Strategy DPD CS23]

 

15. No dwelling or building shall be occupied until a means of access for pedestrian/cycle access including full details of the ramp to the western boundary has been constructed in accordance with details which have been submitted to and approved in writing by the Local Planning Authority.

REASON: In the interests of accessibility and to facilitate access by cyclists and/or pedestrians.

[Relevant Policies: BEBLP M6, Core Strategy DPD CS23]

 

16. Prior to the occupation of each phase of the development, the associated vehicle parking and turning space shall be surfaced and marked out in accordance with a scheme to be submitted to and approved in writing by the Local Planning Authority. The spaces shall not thereafter be used for any purpose other than parking and turning.

REASON: To ensure that the development is provided with adequate car parking to prevent the likelihood of on-street car parking which would be a danger to other road users.

[Relevant Policies: BFBLP M9, Core Strategy DPD CS23]

 

17.  Each phase of the development permitted shall not be occupied until:

(a) details of the location of visitor car parking spaces associated with that phase,

and

(b) details of the signing for the spaces

 

have been submitted to and approved in writing by the Local Planning Authority.

The visitor car parking spaces shall be provided and signed in accordance with the approved details and the spaces and signage shall thereafter be retained.

 

REASON: To ensure that the development is provided with adequate car parking to prevent the likelihood of on-street car parking which would be a danger to other road users.

[Relevant Policies: BFBLP M9, Core Strategy DPD CS23]

 

18.  Prior to the occupation of each phase of the development a scheme shall be submitted to and approved in writing by the Local Planning Authority for covered and secure cycle parking facilities. Each phase of the development shall not be occupied until the approved scheme has been implemented. The facilities shall thereafter be retained.

REASON: In the interests of accessibility of the development to cyclists.

[Relevant Policies: BFBLP M9, Core Strategy DPD CS23]

 

19. Prior to commencement (excluding demolition) of each phase details showing the finished floor levels of the building hereby approved in relation to a fixed datum point are to be submitted to and approved in writing by the Local Planning Authority and the development shall be carried out in accordance with the approved details.

REASON: In the interests of the character of the area.

[Relevant Policies: BFBLP EN20, Core Strategy DPD CS7]        

 

20. The dwellings hereby approved shall not be occupied until a noise mitigation scheme for protecting the proposed dwellings from road noise has been submitted to and approved by the Local Planning Authority.

The noise mitigation measures shall be installed, retained and maintained thereafter in accordance with the approved scheme

REASON: To protect future residents from external noise.

[Relevant Policies:  BFBLP EN25]

21. The dwellings hereby approved shall not be occupied until a scheme for the protection of the occupiers of the proposed dwellings located above the commercial units from noise from the commercial units below has been submitted to and approved by the Local Planning Authority. Any works which form part of the scheme approved by the Local Planning Authority shall be completed before any permitted dwelling is occupied and thereafter shall be retained. 

REASON: To ensure that the amenities of the future residents is not adversely affected by noise.

[Relevant Policies:, BFBLP EN25]

 

22. The dwellings hereby approved shall not be occupied until details of plant and equipment including air conditioning units or chiller units have been submitted to and approved in writing by the Local Planning Authority.  The details should include a noise assessment.  The noise generated from the plant and equipment whilst in operation shall not cause the existing background noise level to increase whilst in operation measured in accordance with BS4142:2014.  The plant and equipment shall be installed and operated in accordance with the approved scheme.

REASON: To ensure that the proposed development does not prejudice the enjoyment of neighbouring occupiers of their properties.

[Relevant Policies: BFBLP EN25]

 

23. The development hereby permitted shall not be begun until a plan showing visibility splays has been submitted to and approved in writing by the Local Planning Authority.  The development shall be carried out in accordance with the approved details.  The visibility splays shall thereafter be kept free of all obstructions to visibility over a height of 0.6 metres measured from the surface of the adjacent carriageway.

REASON: In the interests of highway safety.

[Relevant Policies: Core Strategy DPD CS23]

 

24. The development hereby permitted shall not be begun until a scheme for the internal design of the car park has been submitted to and approved in writing by the Local Planning Authority and shall include details of:

(a)     directional signs and their locations

(b)     surface markings

(c)     pedestrian routes within the car park

(d)     location and design of cycle parking and motorcycle parking (including bollards to control parking areas), details of the car park control system and scheme of operation

(e)     car parking for people with disabilities including signage

(f)      gradients of the pedestrian and access routes

The approved scheme shall be implemented prior to the car park being first brought into use and shall thereafter be retained.

REASON: In the interests of the accessibility and safety of the car park users.

[Relevant Policies: BFBLP M9, Core Strategy DPD CS23]

 

25. No unit shall be occupied until the vehicle parking and turning spaces have been surfaced and marked out in accordance with a scheme to be submitted to and approved in writing by the Local Planning Authority. The spaces and turning areas shall not thereafter be used for any purpose other than parking and turning.

REASON: To ensure that the development is provided with adequate car parking to prevent the likelihood of on-street car parking which would be a danger to other road users.

[Relevant Policies:, BFBLP M9, Core Strategy DPD CS23]

 

26. No commercial unit shall be occupied   until a scheme has been submitted to and approved in writing by the Local Planning Authority for covered and secure cycle parking facilities (including shower facilities and lockers for employees). The facilities shall thereafter be retained.

REASON: In the interests of accessibility of the development to cyclists.

[Relevant Policies: BFBLP M9, Core Strategy DPD CS23]

 

27. No gates shall be provided at the vehicular access to the site. 

REASON: In the interests of highway safety.

[Relevant Policies: Core Strategy DPD CS23]

 

28. The development hereby permitted shall not be begun until a scheme has been submitted to and approved in writing by the Local Planning Authority for off site highway works including the following:

 

Market Street

 

The buildings constructed in the course of the development shall not be occupied/open for trade until the off site highway works have been completed in accordance with the scheme.

REASON: In the interests of highway safety.

[Relevant Policy: BFBLP M4]

 

29. No unit shall be occupied until details of a scheme to allocate parking spaces between units within blocks and a system for enforcing the parking scheme has been submitted to and approved by the Local Planning Authority.

 

REASON: In order to ensure that the development is provided with adequate car parking to prevent the likelihood of on-street car parking which would be a danger to other road users.

[Relevant Policies: BFBLP M9, Core Strategy DPD CS23]

 

30 Development of Block D shall not commence until the results of hydraulic modelling of the overland flow paths have been submitted to and approved by the Local Planning Authority.

REASON: In order to ensure the provision of adequate drainage works to the serve the development.

[Relevant Policy: BWLP WLP6]

 

         

In the event of the S106 agreement not being completed by 31st March 2022, the Assistant Director: Planning be authorised to either extend the period further or refuse the application for the following reasons: -

 

01       In the absence of a planning obligation to secure suitable avoidance and mitigation measures and access management monitoring arrangements, in terms that are satisfactory to the Local Planning Authority, the proposal would be contrary to Regulation 63(5) of the Conservation of Habitats and Species Regulations 2017 (as amended), Policy NRM6 of the South East Plan, Policy EN3 of the Bracknell Forest Borough Local Plan, Policy CS14 of the Core Strategy Development Plan Document and the Thames Basin Heaths Special Protection Area Supplementary Planning Document (2018).

 

02      The proposed development would unacceptably increase the pressure on highways and transportation infrastructure and public open space.  In the absence of a planning obligation in terms that are satisfactory to the Local Planning Authority, and which secure contributions towards integrated transport and highway measures, open space and community facilities, the proposal is contrary to Policies R5 and M4 of the Bracknell Forest Borough Local Plan and CS6, CS8, and CS24 of the Core Strategy Development Plan Document and to the Planning Obligations SPD and the NPPF.

 

03      In the absence of a planning obligation to secure affordable housing in terms that are satisfactory to the Local Planning Authority, the proposal is contrary to Policy H8 of the Bracknell Forest Borough Local Plan, Policies CS16 and CS17 of the Core Strategy Development Plan Document, the Planning Obligations SPD, the resolution on affordable housing made by BFC Executive on 29 March 2011, and the NPPF


04.  The Local Planning Authority has acted positively and proactively in determining this application by identifying matters of concern within the application (as originally submitted) and negotiating, with the Applicant, acceptable amendments to the proposal to address those concerns.  As a result, the Local Planning Authority has been able to grant planning permission for an acceptable proposal, in accordance with the presumption in favour of sustainable development, as set out within the National Planning Policy Framework. 

 

05.     The applicant is advised that the following conditions require discharging prior to commencement of development:
03, 07, 09, 10, 15, 20, 24, 25, 29, 31

The following conditions require discharge prior to development above slab level:06,

The following conditions require discharge prior to the occupation of the dwellings hereby approved:11, 16, 17, 18, 19, 21, 22, 23, 26, 27, 30.

 

No details are required to be submitted in relation to the following conditions; however they are required to be complied with 01, 02, 04, 05, 12, 13, 28.

 

The following conditions require discharge prior to completion of each phase of development: 08.

Doc. Ref:Uniform 7/DC/Agenda

 

The application file to which this report relates can be viewed at the Council's Time Square office during office hours